Today we are performing some controlled disaster recovery tests. For this some relays will be temporarily unavailable (no block minting will be at risk). At the same time we are performing the DR tests we are also evaluating if our alerting system is functioning as expected.
Disaster recovery tests
Facebook
Twitter
LinkedIn
Pinterest